|本期目录/Table of Contents|

[1]杨志强,等.废石尾砂混合料浆充填启动方式与管输阻力[J].武汉工程大学学报,2016,38(4):369-375.[doi:10. 3969/j. issn. 1674?2869. 2016. 04. 011]
 YANG Zhiqiang,GAO Qian*,et al.Backfilled Starting Modes and Pipeline Resistance of Mixed Slurry Prepared with Waste Rocks and Tailings[J].Journal of Wuhan Institute of Technology,2016,38(4):369-375.[doi:10. 3969/j. issn. 1674?2869. 2016. 04. 011]
点击复制

废石尾砂混合料浆充填启动方式与管输阻力(/HTML)
分享到:

《武汉工程大学学报》[ISSN:1674-2869/CN:42-1779/TQ]

卷:
38
期数:
2016年4期
页码:
369-375
栏目:
资源与环境工程
出版日期:
2016-08-28

文章信息/Info

Title:
Backfilled Starting Modes and Pipeline Resistance of Mixed Slurry Prepared with Waste Rocks and Tailings
作者:
杨志强1 2高 谦1*陈得信2武拴军1 2
1. 北京科技大学土木与环境工程学院,北京 100083 ;2. 镍钴资源综合利用国家重点实验室,金川集团股份有限公司,甘肃 金昌 737100
Author(s):
YANG Zhiqiang1 2GAO Qian1*CHEN Dexin2WU Shuanjun1 2
1. School of Civil and Environmental Engineering, University of Science and Technology Beijing, Beijing 100083, China;2. National Key Laboratory of Nickel and Cobalt Resources Comprehensive Utilization, Jinchuan Group Co. Ltd , Jinchuan 737100, China
关键词:
废石尾砂混合充填料浆管输阻力损失工业充填试验
Keywords:
waste rocks tailingsmixed bakfill slurrypipeline resistance loss industrial filling tes
分类号:
TD863
DOI:
10. 3969/j. issn. 1674?2869. 2016. 04. 011
文献标志码:
A
摘要:
针对金川矿山充填法采矿,研究了废石尾砂混合充填料浆配比设计与充填工艺,解决混合粗骨料料浆充填在启动阶段存在的沉淀离析难题,为废弃物在充填采矿中应用奠定基础. 分别进行细砂引流、分级尾砂引流和直接放流三种启动方式的工业试验以及管道输送阻力损失试验. 结果表明,直接放流启动方式可用于混合粗骨料充填料浆在起始阶段的管道输送. 根据混合粗骨料的料浆管输阻力试验,建立充填料浆管道输送阻力与管径、料浆流速和料浆浓度的关系,确定废石与尾砂配合质量比为6∶4的混合粗骨料料浆可输送上限浓度为78%. 在此条件下,混合粗骨料料浆管输阻力最小.
Abstract:
The waste rocks and tailings were used to make backfilled mixed slurry in Jinchuan mining, and the ratio design and filling technology were studied to solve the problems of precipitation and segregation in the startup phase for the application of waste in filling mining. The industrial and pipeline resistance tests were carried out by adpoting three start modes of sand drainage, grade tailings drainage and direct discharge stream. The results show that the direct discharge steam can be used to pipeline delivery of mixed coarse aggregate backfill slurry in start-up phase. The relationships among pipeline resistance, diameter, flow rate and mass fraction of backfill slurry were described by the pipeline resistance tests. The maxiam mass fraction of mixed coarse aggregate backfill slurry delivered by pipeline is 78% at the ratio of waste rocks to tailings of 6∶4 , meanwhile , the pipeline resistance is the smallest.

参考文献/References:

[1] 周成浦. 金川胶结充填技术新进展[J]. 有色矿山, 1993(4): 1-9. ZHOU C P. New progress of cemented filling technology in Jinchuan[J]. Nonferrous mines, 1993(4):1-9. [2] 刘同有, 周成浦. 金川镍矿充填采矿技术的发展[J]. 中国矿业, 1999, 8(4): 1-2. LIU T Y, ZHOU C P. Development of stopping-and filling technology at Jinchuan nickel mine[J]. China mining magazine, 1999, 8(4):1-2. [3] 王正辉. 充填体的质量与控制[J]. 采矿技术, 2001, 1(3): 16-18. WANG Z H. Quality and control of filling body[J]. Mining technology, 2001, 1(3):16-18. [4] 刘同有,韩斌,王小卫. 镍闪速炉水淬渣胶结充填配合比优化选择与分析[J]. 中国矿业,2000, 9(6): 19-22. LIU T Y, HAN B, WANG X W. Utilization of nickel flash-smelting furnace slag as material for cemented stowing[J]. China mining magazine, 2000, 9(6): 19-22. . [5] 王贤来, 姚维信, 王虎, 等. 矿山废石全尾砂充填研究现状与发展趋势[J]. 中国矿业, 2011, 20(9): 76-79. WANG X L, YAO W X, WANG H, et al. The directions of R&D on backfill with waste rock and total tailings in underground mine[J]. China mining magazine, 2011, 20(9):76-79. [6] 乔登攀, 程伟华, 张磊,等. 现代采矿理念与充填采矿[J]. 有色金属科学与工程, 2011, 2(2): 7-14. QIAO D P, CHENG W H, ZHANG L, et al. Modern mining concepts and filling technique[J]. Nonferrous metals science and engineering, 2011, 2(2):7-14. [7] 郭慧高, 辜大志, 邹龙, 等. 浅析废石胶结充填技术在金川二矿区的应用前景[J]. 采矿技术, 2011, 11(4):39-41. GUO H G, GU D Z, ZOU L, et al. Application prospect of mollusk cementation filling technology in Jinchuan mining No.2 area[J]. Mining technology, 2011,11(4):39-41. [8] 张磊, 乔登攀, 程纬华, 等. 金川粗骨料级配与强度分析[J]. 矿冶, 2012, 21(2):12-15. ZHANG L, QIAO D P, CHENG W H, et al. Analysis on gradation and intensity of coarse aggregate of JNMC[J]. Mining and metallurgy, 2012,21(2):12-15. [9] 姚维信. 矿山粗骨料高浓度充填理论研究与应用[D]. 昆明:昆明理工大学, 2011:9-17. [10] 苑雪超, 乔登攀. 金川二矿废石胶结充填料浆搅拌方式的研究[J]. 有色金属(矿山部分), 2010, 62(4):6-10. YUAN X C, QIAO D P. Analysis of waste rock-cemented filling stirring system in the second mine of Jinchuan[J]. Nonferrous metals (Mining section), 2010, 62(4):6-10. [11] 王晓宇, 乔登攀. 废石全尾砂高浓度充填料浆管输阻力影响因素分析[J]. 有色金属(矿山部分), 2010, 62(4):61-65. WANG X Y, QIAO D P. Analysis of the influence of waste rock-full tailings high concentration filing on the resistance of slurry pipeline transport[J]. Nonferrous metals (Mining section), 2010, 62(4):61-65. [12] 张秀勇. 金川二矿区废石-全尾砂高浓度料浆泵压管输充填系统研究[D]. 昆明:昆明理工大学, 2010:28-38.

相似文献/References:

备注/Memo

备注/Memo:
更新日期/Last Update: 2016-07-29